Top issues during term (9)(Roads)
Peach Street sidewalk gap closure
About $40,000 in matching funds will be needed in the 2028 budget; the grant covers the rest.
Expanded 2026 Paving Program and Budget Amendment
$875,787 from reserves — no tax increase, but reserves dip to about 15%.
CDBG Sidewalk Project and Sidewalk Deferrals
$83,105, mostly block grant funds.
Bridge preservation funding
No local match; $1.34 million in federal funds covers the work.
Airport Truck Traffic Damaging Grant Avenue
Potential road repair costs if damage occurs without a bond in place.
Peninsula Drive Trail Extension
$2.5 million grant; total project now estimated near $10 million.
Traffic Signal Study at Route 99 and Golf Club Road
If a signal is warranted, the township pays for installation, maintenance, and operation.
Route 5 Traffic Signal Upgrades (Green Light-Go Grant)
State grant covers up to $1.8 million, or 20%, of the signal upgrade costs.
Bicycle Lane Infrastructure
Installation costs are significant; grant funding may be available.